
Double Closure of the A12 in the Netherlands: Traffic Jams and Detours to Paralyze Transport
The Dutch A12 motorway, one of the key routes for international transport, will be completely closed twice in 2025. Each closure will last for 9 consecutive days and nights, with the affected section stretching from Veenendaal to Utrecht (approximately 30 km) – one of the most frequently used corridors by freight carriers transiting through the Netherlands.
Rijkswaterstaat – the Dutch road authority – has announced a major resurfacing project. The old asphalt will be completely removed and replaced with new pavement using so-called “silent asphalt” technology, aimed at reducing noise levels in the surrounding areas. Dutch authorities are already warning of severe traffic congestion and delays that may extend travel times by more than an hour.
A12 Closure Dates
❌ May 9 (Friday), 8:00 PM – May 19 (Monday), 5:00 AM
❌ August 22 (Friday), 8:00 PM – September 1 (Monday), 5:00 AM
Plans for the closure of the opposite direction (Utrecht → Veenendaal) are still under development, but similar disruptions can be expected along that stretch as well.
Latest Posts
September 15 with exemption from truck bans in Slovakia
The Presidium of the Slovak Police has reviewed the request of the Road Haulage Association of the Slovak Republic, CESMAD Slovakia, and has granted a...
September 15 with exemption from truck bans in Slovakia
Nighttime closures of the Van Brienenoord Bridge on the A16 in Rotterdam – detours and disruptions
In mid-September, drivers will face major disruptions on the A16 motorway in Rotterdam. Due to maintenance works, the Van Brienenoord Bridge will be closed...
Bulgaria: August Restrictions for Trucks on the Trakia Motorway
In August, Bulgaria is introducing additional traffic restrictions for heavy goods vehicles over 12 tonnes on the Trakia Motorway (A1), on the section...